Information to record

Use these prompts to agree the record for your project. Keep the answers and their source references together; leave an unknown value explicit rather than filling it with an assumption.

Site code
Use a clear project or location identifier.
Tree ID
Preserve the stable asset reference.
Visit reference
Identify the dated survey or inspection.
File suffix
Distinguish map, report, schedule and evidence files.
Version
State the issue or revision consistently.

Checks for this task

  1. Test names with two sites and repeat visits.
  2. Check leading zeros and punctuation survive spreadsheet export.
  3. Keep a record of genuine name changes and their earlier references.

A worked example

Illustrative example, not a client case: SITE-B-T012 remains the tree ID on every visit. A report file includes the site and issue date, while photographs add the visit reference. Sorting the schedule does not rename the tree.

Scope and limits

Naming conventions improve traceability but do not replace access control, backup or professional review.

Use the worksheet

The download contains the prompts and checks above with space for your project notes. It is a plain text document you can edit in a text editor or copy into your project brief. It contains no client information and does not run calculations, import records or change an account.

Continue the workflow

Prepared by Canopy.