Information to record

Use these prompts to agree the record for your project. Keep the answers and their source references together; leave an unknown value explicit rather than filling it with an assumption.

Tree ID
Identify the affected asset.
Earlier reference
Link the preceding visit or advice.
Change type
Distinguish observation, correction and revised recommendation.
New evidence
Identify the dated source for the change.
Reviewer and issue
Record who reviewed it and which output changed.

Checks for this task

  1. Retain earlier observations rather than overwriting their history.
  2. Do not treat a new photograph as a revised recommendation by itself.
  3. Update connected outputs only after the change is reviewed.

A worked example

Illustrative example, not a client case: A repeat visit adds photographs for T023. The change log records new evidence. A later reviewed recommendation is entered separately, preserving the distinction between collected material and professional advice.

Scope and limits

The worksheet documents change; it does not calculate deterioration, risk or inspection intervals.

Use the worksheet

The download contains the prompts and checks above with space for your project notes. It is a plain text document you can edit in a text editor or copy into your project brief. It contains no client information and does not run calculations, import records or change an account.